FHWA Buy America 55% Rule: Manufactured Products Compliance Guide
Link Title
Link Short URL
Link Long URL
Description:
Since October 1, 2026, every manufactured product permanently built into a Federal-aid highway project obligated on or after that date must pass two FHWA Buy America tests: final assembly in the United States, and more than 55% of total component cost from US components. The rule, at 23 CFR 635.410, ended a general waiver that had excused manufactured products since 1983. Traffic signals, lighting, ITS equipment and many other items now need supplier evidence behind every unit. This guide explains how the two-part test works, why the project obligation date decides which version of the rule applies, and how iron and steel, manufactured products and construction materials are each tested differently on the same project. It also sets out a practical flowdown approach, covering the clauses, manufacturer letters, mill test reports and supplier declarations general contractors need to collect and keep.
Keywords (Tags):
Created by:
Certivo
Created on:
Hits:
2
|